Excavators. Wheel loaders. Anything that rolls.
80,000 lb heavy equipment lift for construction machinery, wheel loaders, and agricultural equipment. 4-column PLC control, 54-inch service height. Full installation included.
✓ In Stock — Ships in 5-10 business days
| Power | 480V 3-phase |
| Columns | 4 independent hydraulic |
| Control | PLC with load sensing + auto-level |
| Capacity | 80,000 lbs total |
| Delivery | Full site engineering + installation + training |
| Lead Time | 12–16 weeks |
| Service Height | 54” |
| Floor Requirement | 6” reinforced concrete, 10,000 PSI anchor zones |
| Max Ground Clearance | 36” |
| Min Ground Clearance | 12” |
Multi-angle views of the ForceMax Heavy Equipment Runway Lift 80,000 lb. Click any image to zoom.
See this class of lift in action. The video below shows installation, real-world operation, and the kind of shop this lift belongs in.
Heavy equipment runway systems are engineered for municipal, military, and commercial fleet applications. Multiple hydraulic power units operating in sync lift vehicles from 60,000 to 120,000+ lbs.
Multiple hydraulic power units are tied together via an electronic synchronization controller. The controller monitors each column's position independently and adjusts flow rate to maintain level lift within 1/4" across the entire runway.
An industrial-grade hardwired console (with optional wireless pendant) displays column heights, load readings, and fault codes. Raise, lower, and e-stop are large guarded buttons rated for gloved-hand operation.
Extended runway decks (up to 30'–50') are driven onto at grade with optional approach ramps. Once the vehicle is positioned, retract the ramps and engage the safety interlocks before lifting.
Three independent safety systems: mechanical position locks, hydraulic pressure-hold valves, and an electronic overload sensor on each column. If any column reads an overload, the system halts and sounds an alarm before damage occurs.
Three independent locking systems per column: mechanical pawl locks, hydraulic pressure-hold valves, and load-sensing e-stops. All three must be bypassed for the platform to lower — an essentially impossible accidental sequence.
Each column includes a strain gauge or hydraulic load sensor. The central console displays real-time load per column. An imbalance alarm sounds if any single column exceeds its share of the rated load by more than 10%.
If total load exceeds the system rating, the central controller cuts all power before the mechanical safety systems are needed. This pre-emptive halt prevents any damage to the hydraulic or mechanical components.
Optional safety light curtains or pressure-sensitive mats around the lift perimeter halt the system if any person enters the lift area during operation. Required for OSHA compliance in commercial fleet operations.
This is for shops that service heavy iron. The ForceMax is not a stock item — every installation is a project. Lead time is 12–16 weeks. Factory technicians do the site survey, foundation spec, installation, and certification. Contact sales for a site evaluation before ordering.