Shop  /  Vehicle Lifts  /  ForceMax Heavy Equipment Runway Lift 80,000 lb
Semi-Truck Lift

ForceMax Heavy Equipment Runway Lift 80,000 lb

Excavators. Wheel loaders. Anything that rolls.

$39,999
Brand: ForceMax
Weight: 18000.00 lbs
Dimensions: Configured to site

80,000 lb heavy equipment lift for construction machinery, wheel loaders, and agricultural equipment. 4-column PLC control, 54-inch service height. Full installation included.

  • 80,000 lb total system capacity
  • Wheel and track equipment compatible
  • Ground clearance range: 12” to 36”
  • 4 independently controlled hydraulic columns
  • PLC synchronized control with load sensing
  • 54” service height
  • Removable, reconfigurable runway sections
  • Factory-certified installation and commissioning
Request a Quote

✓ In Stock — Ships in 5-10 business days

🧰
IronCrate Toolbox
Everything you need to make your decision
The ForceMax Heavy Equipment Runway Lift is the terminal solution for shops servicing construction equipment, agricultural machinery, and heavy commercial vehicles above Class 8. The drive-on runway system handles wheeled and rubber-tracked equipment with ground clearance from 12” to 36”. 80,000 lb total system capacity — sufficient for loaded articulated dump trucks, large wheel loaders, and motor graders. Four independently controlled hydraulic columns with a synchronized PLC control system raise the equipment to 54” service height. The steel runway sections are removable and reconfigurable for different equipment footprints. Integrated drainage channels in the runway surface. Staircase-style access stairs on all four sides. Full site engineering, installation, and commissioning by factory-certified technicians.
Power480V 3-phase
Columns4 independent hydraulic
ControlPLC with load sensing + auto-level
Capacity80,000 lbs total
DeliveryFull site engineering + installation + training
Lead Time12–16 weeks
Service Height54”
Floor Requirement6” reinforced concrete, 10,000 PSI anchor zones
Max Ground Clearance36”
Min Ground Clearance12”

See this class of lift in action. The video below shows installation, real-world operation, and the kind of shop this lift belongs in.

Heavy equipment runway systems are engineered for municipal, military, and commercial fleet applications. Multiple hydraulic power units operating in sync lift vehicles from 60,000 to 120,000+ lbs.

Synchronized Hydraulics

Multiple hydraulic power units are tied together via an electronic synchronization controller. The controller monitors each column's position independently and adjusts flow rate to maintain level lift within 1/4" across the entire runway.

Central Control Console

An industrial-grade hardwired console (with optional wireless pendant) displays column heights, load readings, and fault codes. Raise, lower, and e-stop are large guarded buttons rated for gloved-hand operation.

Runway Access

Extended runway decks (up to 30'–50') are driven onto at grade with optional approach ramps. Once the vehicle is positioned, retract the ramps and engage the safety interlocks before lifting.

Safety Interlocks

Three independent safety systems: mechanical position locks, hydraulic pressure-hold valves, and an electronic overload sensor on each column. If any column reads an overload, the system halts and sounds an alarm before damage occurs.

Note: Site prep: runway systems require an engineered concrete pad specific to your vehicle weight and axle loading. Provide your civil engineer with the lift's distributed load spec sheet before pouring.

⚙️ Triple-Redundant Locks

Three independent locking systems per column: mechanical pawl locks, hydraulic pressure-hold valves, and load-sensing e-stops. All three must be bypassed for the platform to lower — an essentially impossible accidental sequence.

📊 Column Load Monitoring

Each column includes a strain gauge or hydraulic load sensor. The central console displays real-time load per column. An imbalance alarm sounds if any single column exceeds its share of the rated load by more than 10%.

🚨 Electronic Overload Halt

If total load exceeds the system rating, the central controller cuts all power before the mechanical safety systems are needed. This pre-emptive halt prevents any damage to the hydraulic or mechanical components.

🔒 Perimeter Safety Interlocks

Optional safety light curtains or pressure-sensitive mats around the lift perimeter halt the system if any person enters the lift area during operation. Required for OSHA compliance in commercial fleet operations.

✓ ALI/ETL Heavy-Duty Certified✓ ANSI/ALI ALCTV Standard✓ CE EN-1493 Heavy Class✓ OSHA 1910.178 Compliant✓ ISO 4240 Compliant

How does this compare?

This is for shops that service heavy iron. The ForceMax is not a stock item — every installation is a project. Lead time is 12–16 weeks. Factory technicians do the site survey, foundation spec, installation, and certification. Contact sales for a site evaluation before ordering.